  Abstract:This article introduces the application of the multi-function energy meter in a farm in Mozambique and the solution of energy management system. The system adopts intelligent power meters to collect various electrical parameter and switching signals at the distribution site and the way of local networking, communicate via field bus and upload to background after networking.

  Keywords:Energy meter;Industrial projects;Intelligent power meter;Energy management system

  0.Project Overview

  The farm is located in Nampula, Mozambique, and mainly uses a three-phase electric energy meter APM800 and split core current transformers.It is used for electric energy and power measurement, and has event recording and data report export function.

  Acrel-3000 energy management system provides decentralized data acquisition and centralized monitoring and management of the substation and distribution system. It networks the secondary equipment of the power distribution system, connects the field equipment of scattered substation into an organic whole through computer and communication network, realizes remote monitoring and centralized management of grid operation.

  1.System Introduction

  This system adopts a hierarchical distributed structure,that is,the equipment layer, the communication layer and the station control management layer.

  The equipment layer is mainly multi-function energy meters. The corresponding primary equipment of these devices are respectively installed in the electrical cabinet. These devices all adopt RS485 communication interface,and realize data collection through field MODBUS network communication.

  The communication layer is mainly an industrial serial server.Its main function is to centrally collect the devices scattered in the field and transmit data to the station control management layer at the same time to complete the data interaction between the equipment layer and the station control management layer.

  The station control management layer is equipped with high-performance industrial computers, monitors, UPS power supplies, printers and other equipment.The system is installed on the computer, collects and displays the operating status of the field equipment, and displays it to the user in the form of human-computer interaction.

  2.Main Function

  2.1Data acquisition and processing

  Data collection is the basis of power distribution monitoring. The data collection is mainly completed by the bottom multi-functional network instrument collection to realize the local real-time display of remote data.

  The signals that need to be collected include: three-phase voltage U, three-phase current I, frequency Hz, power P, power factor COSφ, electricity EpI, remote device operating status and other data.

  Data processing is mainly to display the electrical parameters collected as required to users in real time and accurately to meet the requirements of automation and intelligence for power distribution monitoring. At the same time, the collected data is stored in the database for users to query.

  2.2Human-computer interaction

  The system provides a simple, easy-to-use and good user interface. Adopt full Chinese interface, graphically display the primary electrical wiring diagram of low-voltage power distribution system, display the status of power distribution system equipment and corresponding real-time operating parameters, the screen will switch regularly; the screen will be dynamically refreshed in real time; analog display; switch display; continuous recording display etc.

  2.3Historical events

  The historical event viewing interface mainly provides convenient and friendly human-computer interaction for users to view the fault records, signal records, operation records, and limit violation records that have occurred. Through the historical event viewing platform, you can conveniently locate the historical event you want to view according to your own requirements and query conditions, and provides good software support for you to grasp the operation of the entire system.

  2.4Database establishment and query

  It mainly completes the timing collection of remote measurement and remote information, and establishes a database, and generates reports on a regular basis for users to query and print.

  2.5User authority management

  For users of different levels, different authority groups are set to prevent the loss of production and life due to human misoperation, and realize the safe and reliable operation of the power distribution system.Users can log in, log out, modify passwords, add and delete operations through user management, which is convenient for users to modify accounts and permissions.

  2.6Report query

  The main function of the report management program is to design report styles according to the needs of users, filter, combine and count the data processed in the system to generate report data that users need.This program can also adopt the regular saving, printing or summon saving and printing modes for the report file according to the needs of users.At the same time, this program also provides users with the function of managing the generated report files.

  The report has the functions of freely setting the query time to realize the electric energy statistics of the day, month and year, data export and report printing.

  3.Product Introduction

  4.Project Summary

  It is paramount important that the safety of the projects in the application of power distribution facilities.This article introduces the application of Acrel-3000 energy management system can realize real-time monitoring of power supply and distribution circuits in power distribution rooms.It can not only display the power consumption status of the loop, but also has the function of network communication, and can form an electric energy management system with serial server, computer, etc.The system realizes the analysis and processing of the collected data, real-time display of the operation status of the distribution circuits in the distribution room, pop-up alarm dialog, voice prompt for load exceeding limits, and generates various electric energy reports, analysis curves, graphics, etc., which is convenient for remote meter reading, analysis and research of electric energy.The system is safe, reliable and stable in operation, providing a true and reliable basis for industrial projects to solve power problems, and has achieved good benefits.

91国产网址在线观看| 97精品在线视频免费| 日韩色图在线观看视频| 91亚色在线免费观看| 亚洲精品一区二区三区高清| 有码国内精品人妻少妇| 亚洲性视频日韩性视频| av天堂中文一区二区三区| 亚洲精品欧美综合二区| 国产一区二区精品久久久女同 | 一区二区三区国产欧美日本| 太爽了少妇高潮在线看片| 亚洲视频一区视频二区| 精品一区二区视频在线观看网站| 国产国产精品国产自在午夜| 亚洲另类欧美日韩中文字幕| 日韩一日韩一区二区三电影在线观看| 国产三级视频在线2022| 宅男视频在线观看视频| 成年人三级黄色片视频| 免费午夜福利一区二区| 久久婷婷国产综合精品青草| 女人高潮被爽到呻吟在线| av天堂久久人妻精品加勒比| 欧美一区二区三区午夜| 欧美日韩电影一区二区三区| 久久久久久成人亚洲| 国产亚洲av一区二区三区| 人妻少妇性色精品专区av| av东京热免费看一区| 国产精品青青在线观看爽香蕉| 国产av毛片一区二区| 欧美亚洲另类麻豆综合在线| 91久久国产综合精品| 欧美日韩一区二区激情在线| 日产极品一区二区三区| 天天操夜夜夜夜夜操| 国产精品一区日韩专区| 亚洲av成人在线资源| 日韩人妻精品中文字幕专区不卡| 91综合午夜精品福利|